The removal of a 450-ton steel bridge. Using a 4 x 6 axle line configuration with 4 PPU, we successfully ‘drove’ the bridge onto its concrete foundations, preparing the site for the installation of the new bridge.




The removal of a 450-ton steel bridge. Using a 4 x 6 axle line configuration with 4 PPU, we successfully ‘drove’ the bridge onto its concrete foundations, preparing the site for the installation of the new bridge.



RoRo Operations with our triple 22 axle lines and PPU configuration and in-house designed and fabricated modular transport saddles for the transport of 101 monopiles. All...
The removal and transport of three silos, each weighing 130 tons and standi and efficient handling. ng 36 meters tall, carried out using a double 12-axle line and 2...