The removal and transport of three silos, each weighing 130 tons and standi and efficient handling.
ng 36 meters tall, carried out using a double 12-axle line and 2 PPU configuration for safe.




The removal and transport of three silos, each weighing 130 tons and standi and efficient handling.
ng 36 meters tall, carried out using a double 12-axle line and 2 PPU configuration for safe.



RoRo Operations with our triple 22 axle lines and PPU configuration and in-house designed and fabricated modular transport saddles for the transport of 101 monopiles. All...
The removal of a 450-ton steel bridge. Using a 4 x 6 axle line configuration with 4 PPU, we successfully 'drove' the bridge onto its concrete foundations, preparing the site for the installation of...